- Responsible body
- Department for Urban Planning, Construction and Investment
- How to obtain it
- In person
Fill in the form and submit it to the responsible office.
Forms
- Download: Request for the legalisation of buildings (PDF, 97 KB)
- Download: Request for temporary connection to electricity/water/gas for unlawfully constructed buildings (natural persons) (PDF, 122 KB)
- Download: Request for temporary connection to electricity/water/gas for unlawfully constructed buildings (residents’ associations) (PDF, 130 KB)
- Download: Statement for temporary connection to electricity/water/gas for unlawfully constructed buildings (PDF, 73 KB)
Contact details of the responsible office
Department for Urban Planning, Construction and Investment
- Head
- Head: Dragan Krstić
- Phone
- 026/4622021